Dropped kerb in Ealing: cost, rules and approval checklist
Checked against Ealing Council's policy and website on 19 November 2026
Ealing has one of the lowest application fees in London at £75, and one of the shortest minimum front garden depths. The fee is still lost if an engineer finds your frontage ineligible, so check the rules below first.
This page covers homes in Ealing, Acton, Southall, Hanwell, Greenford, Northolt and Perivale. Ealing Council's highways service assesses applications, and only the council's contractors may work on the pavement. You do the front garden works yourself first.
The rules at a glance
Parking space
At least 4.2m deep, or 3.8m if your frontage is over 6.5m wide. The frontage must be at least 2.4m wide, with a 1.2m clear path to the front door when the car is parked.
Crossover width
Standard 2.4m. Up to 4.8m only when shared with a neighbour. One dropped kerb per property.
Street trees
At least 0.6m between the crossover and any tree pit. Street trees are generally not removed, and you pay for any relocation or replanting.
Controlled parking zones
CPZ bay changes are priced after a site visit and can be significant. A yellow-line change may cost over £1,500 and take three months or more.
Distances
More than 10m from the nearest road junction. Grass verges wider than 3m are not allowed.
Visibility
A 1.5m by 1.5m pedestrian splay each side of the crossover, with nothing over 0.6m high.
What a dropped kerb costs in Ealing
- Application fee: £75. It is not refunded if the engineer visits and finds your property ineligible.
- Building the crossover: about £1,500 for an average dropped kerb, according to the council. Ealing's 2021 application pack put a typical cost at about £1,200.
- Extra if anything is in the way. Moving lamp posts, street furniture, signs, disabled bays or trees is charged to you.
- In a CPZ, bay and line changes are extra. See what each London council charges.
Do you need planning permission?
Usually not for a house. You are likely to need it if:
- your road is a classified road or a TfL road (the council publishes both lists)
- your street is in a conservation area covered by an Article 4 direction
- the property is divided into flats, maisonettes or a house in multiple occupation
- it is a commercial property
- the building is listed (it may need permission)
Paving the front garden needs no planning permission if the property is not listed or in an Article 4 area and any hard surface over 5 square metres is permeable. Water must never drain onto the pavement. Taking down a front wall needs permission only for listed buildings, Article 4 areas, or conservation areas where the wall is 1m or more high.
How long it takes
Ealing aims to decide within six weeks. Approval and the quote last a year. Once you send a photo showing the front garden is ready, the council arranges construction within eight weeks.
If you are refused
Ealing's guidance does not describe an appeal process. In one 2020 case the Local Government Ombudsman declined to investigate a complaint about an Ealing refusal.
Before you pay the application fee
- Measure from the back of the pavement to your house or bay window: 4.2m, or 3.8m if your frontage is over 6.5m wide.
- Check there will still be a 1.2m path to your front door with the car parked.
- Measure to the nearest tree pit: under 0.6m means refusal.
- Check you are more than 10m from a junction.
- Look for a parking bay or yellow line outside, and check whether your road is classified or in an Article 4 area.
How Ealing compares with its neighbours
| Council | Application fee | Minimum parking space | Street tree rule |
|---|---|---|---|
| Hounslow | Not published | 4.8m × 2.4m | Not within 1m; precautionary area 4× girth |
| Hammersmith & Fulham | £550 | 4.8m × 2.4m | Not stated |
| Hillingdon | £149 | Not published | Removed only if dead, dangerous or diseased |